Facility Carried
i
| IL 170 FAP 786 |
Feature Crossed
i
| IL RIVER & RIVER RD |
Maintenance Reponsibility
i
| I.D.O.T. |
Service On/Under
i
| HIGHWAY
/
HIGHWAY-WATERWAY |
Sufficiency Rating
i
| 64.5 |
Length
i
| 1703.6 |
Structurally Deficient
i
| No |
Functionaly Obsolete
i
| No |
Annual Average Daily Traffic (AADT) Count
i
| 4,750 |
Est. Truck Percentage from AADT
i
| 12% (some routes prohibit truck access) |
Route
i
| IL 170 |
Original Construction / Reconstruction
i
| 2009 / N/A |
Inspection Date
i | | |
Deck
i
| 6 | SATISFACTORY CONDITION - MINOR DETERIORATION |
Superstructure
i
| 7 | GOOD CONDITION - SOME MINOR PROBLEMS |
Substructure
i
| 5 | FAIR CONDITION - MINOR SECTION LOSS, CRACKS |
Culvert
i
| N | NOT APPLICABLE |
Channel and Protection
i
| 9 | EXCELLENT CONDITION (NEW) |
Structural Evaluation
i
| 5 | BETTER THAN ADEQUATE TO BE LEFT IN PLACE |
Deck Geometry
i
| 4 | MINIMUM ADEQUACY TO BE LEFT IN PLACE |
Underclearance-Vert/Lat.
i
| 4 | MINIMUM ADEQUACY TO BE LEFT IN PLACE |
Waterway Adequacy
i
| 9 | SUPERIOR TO PRESENT DESIRABLE CRITERIA |
Approach Roadway Align
i
| 8 | EQUAL TO PRESENT DESIRABLE CRITERIA |
Bridge Railing Appraisal
i
| 3 | Meets Standards |
Approach Guardrail
i
| 3 / 3 / 3 | Acceptable / Acceptable / Acceptable |
Pier Navig. Protection
i
| 1 | NAVIGATION PROTECTION NOT REQUIRED |
| |